
Consider drum and rope together
Drum dimensions and geometry, winding direction, number of layers, rope length and equipment manufacturer instructions form part of preparation. Access and downtime planning are reviewed in advance.
Scope to review
- Wire rope spooling
- Synthetic rope spooling
- Winch installation support
How we work
We begin with the requirement and available documentation. The scope, inputs, provider, deliverables and delivery conditions are then clarified in writing. Direct work and partner-delivered work are distinguished in the quotation.
Scope and responsibility
Equipment, personnel and responsibility limits for installation or spooling are defined in the quotation.
Prepare for discussion
Start with equipment type and label, an application photograph or drawing, manufacturer instructions, delivery or site location and timing. Identify any information that remains unknown.

